April 5, 2016

Naval Air Station (NAS) Whidbey Island installed a competitor’s (non-ECS) in-
vessel composting system in the 1990s.  Technical support had been an issue for
some time, and in 2015 the vintage custom control system it came with died.  

ECS won the bid to install new controls, VFDs, sensors, and motorized dampers to
control and monitor their eight ves...

March 31, 2016

The Ottawa Valley Waste Recovery Centre (OVWRC) in Pembroke, Ontario has been
composting green waste amended food waste in an ECS Containerized
In-Vessel system since 2001. The original CompTroller™ 1.0 automated aeration
control and monitoring system served them well for over 15 years.  But between
OS legacy issues and part obsolescence, it was bec...

January 15, 2016

Synagro’s South Kern Compost Manufacturing Facility (SKCMF) biosolids composting facility at South Kern Industrial Center is one of the largest biosolids composting facilities in California. Until recently the facility used an Aerated Static Pile (ASP) system with negative aeration with a biofilter, manual aeration controls, and our 2nd Generation E...

December 24, 2013

The Granby Sanitation District, a long term client of ours, called us worriedly. They were concerned whether their CompTroller™ software would run on a new Operating System. Their concerns were completely natural. Many of us have experienced issues with software when purchasing a new computer or upgrading to a new Operating System and we have to be...

Please reload

Recent Posts

December 19, 2018

March 30, 2017

Please reload

Search By Tags
Follow Us
  • Facebook Basic Square
  • LinkedIn Social Icon

4220 24th Avenue West

Seattle, Washington 98199

T: (206) 634-2625     F: (206) 634-1309

info@compostsystems.com

  • Facebook - White Circle
  • LinkedIn - White Circle

© 2019 Engineered Compost Systems

Engineered Compost Systems